Oral evidence: Exiting the EU: supplying the health and social care sectors, HC 2657
Oral evidence, 2 October 2019.
Witnesses
Sir Chris Wormald, Steve Oldfield, Professor Keith Willett, Bernadette Kelly and Gareth Davies.
Chair
Welcome to the Public Accounts Committee on Wednesday 2 October 2019. We are here today to look at the important issue of what will happen to the supply of medicines and other provisions to the health and social care sectors in the event that the UK leaves the European Union without a deal. These are preparations that have obviously been underway before, when the expected date to leave was 29 March. We are now 29 days from 31 October so it is a very pressing situation. I would like to put on record my thanks to the officials who moved their diaries around in order to attend today, now that Parliament is not prorogued. I appreciate that you were prepared to come next week, which was already pulling it forward from when we had expected, so thank you very much for that. It is a very time-critical issue. The NAO report was only published on Friday, so I think this is a record in terms of looking at it, but it is very important that we do. Given that around 7,000 of 12,300 medicines licensed for use in the UK come from the EU, it is vital that these issues are resolved. We want to look today at what happens to those medicines, how preparations are underway to deal with that, and to look at the social care sector and how that is being supported. As we have advised you, we have a few other questions for various officials. I will let you know in advance, so you can sit back, Sir Chris, for a moment, because we are going to focus on Ms Kelly, to talk to her about High Speed 2 and Thomas Cook first. Then we will move on to some NHS issues for you, Sir Chris, before we move into the main issue, particularly on the announcements made about funding for hospitals and some of the issues in today’s news. I will introduce the witnesses first. I think most are known, but we have Gareth Davies, who is here as director general for international and security group at the Department for Transport. Welcome to you. I think, Mr Davies, it is your first time in front of us.
Gareth Davies
It is.
Chair
Welcome. We are a very friendly bunch, as I am sure Ms Kelly has advised you. We have Bernadette Kelly, who is a regular attender at our meetings, and she is the Permanent Secretary at the Department for Transport. Then we have Sir Chris Wormald, who is the Permanent Secretary at the Department of Health and Social Care. We have Professor Keith Willett, who is the EU exit strategic commander—it makes you feel like you should be wearing a uniform—and medical director for acute care and emergency preparedness at NHS England, never an organisation known for its short titles. You can perhaps explain when you first speak exactly what that means. It sounds like you are running NATO or something, but maybe that would be simpler in the current climate. Then we have Steve Oldfield, who is the chief commercial officer at the Department of Health and Social Care. We will have some questions very much directed to you, Mr Oldfield, on drug pricing.
Sir Geoffrey Clifton-Brown
Ms Kelly, I am sorry about your voice. Take your time and we will listen quietly. I am going to ask you questions on HS2, but I appreciate you may not have been briefed on detailed questions on HS2. If you are not, I am happy that you should write to the Committee afterwards. Could you tell us how much money has been spent on HS2 to date?
Bernadette Kelly
Up until the end of the last financial year, March 2019, we had spent £7.4 billion on HS2 to date. Clearly, there will have been additional expenditure going on during the current financial year. I do not have a precise figure for that.
Sir Geoffrey Clifton-Brown
No, I understand that. Do not read anything into this question. I have absolutely no prior knowledge. If you were to cancel it today or with reasonable notice, in three months’ time, how much of that £7.4 billion is on property, so how much would you recover?
Bernadette Kelly
The property element of that I think is about £3.3 billion, or something of that order, so clearly we would expect to recover some of that cost. Again, I cannot give an exact number. I expect the property figure itself may be somewhat higher now as well.
Sir Geoffrey Clifton-Brown
How robust is the estimated cost figure of £55.6 billion? What is your latest information on that figure?
Bernadette Kelly
Our latest information is the information contained in the stocktake that the Secretary of State published on 5 September, which was done by Allan Cook, the relatively new chair of High Speed 2. He has estimated a cost range for the project of between £72 billion and £78 billion.
Sir Geoffrey Clifton-Brown
How reliable do you think that is?
Bernadette Kelly
Allan Cook’s stocktake represents a serious and thorough piece of work. Doug Oakervee, as you know, is currently leading an independent review into whether and how to proceed with HS2. One of the things that review will need to do is test and assure those figures and determine what, in Doug Oakervee’s view, is the best available figure now for the total cost of the project.
Sir Geoffrey Clifton-Brown
How much will he be feeding into his review the lessons learnt from Crossrail? Crossrail for a long time was on time and on budget, and then suddenly now it seems to have gone off kilter on both.
Bernadette Kelly
We are all very concerned to be feeding in the lessons learned from Crossrail. Within the Department, we have been thinking very hard for some time now about how we do that most appropriately in the context of HS2. Allan Cook himself in his stocktake referenced the lessons learned report that we published in April. I think he would argue that the report he published, the stocktake, with ranges for both cost and schedule, was a reflection of those lessons learned. Doug Oakervee’s terms of reference also include a requirement for him to consider lessons learned from other projects for HS2.
Sir Geoffrey Clifton-Brown
Are there any considerations going on as to any major changes to the original plans, for example starting at Old Oak Common rather than Euston?
Bernadette Kelly
Doug Oakervee’s review is intended to be a fairly fundamental review of the project. It is whether and how to proceed, and therefore in the question of how he will also be looking at the scope of the project and whether changes are needed. We will have to wait and see what his review concludes. I think it likely that there will be more scope for changes to phase 2b than to phase 1, simply because of the stage of development that part of the project is in and the fact that it has not yet been subject to a hybrid Bill.
Sir Geoffrey Clifton-Brown
What is the timing on his report?
Bernadette Kelly
We have said that we expect him to conclude his review in the autumn.
Chair
We heard mid-October, which is quite a fraught month.
Bernadette Kelly
It will be quite a fraught month and that thought has not escaped my notice. Clearly, Doug Oakervee will need to present his findings to Ministers and Ministers will need to determine what they want to do on the basis of his review. I prefer not to get drawn on a very particular date.
Chair
The date is the date he will produce it, not the date the Ministers will decide on it.
Bernadette Kelly
We have said that the review is to conclude in the autumn. I am working towards Doug Oakervee’s review presenting some recommendations during the autumn and the Government deciding exactly what they want to do in response to those as soon as possible thereafter. I do not want to be drawn on mid-October.
Chair
I think it was No. 10 that said mid-October.
Bernadette Kelly
He is keen to get the work done quickly, quite understandably, given the questions that are being raised, but he needs to do the work thoroughly and the Government need to be able to decide how they want to respond.
Sir Geoffrey Clifton-Brown
Will it be put in the public domain the moment he has completed it, and then Ministers will take their time to decide? What is the mechanism going to be?
Bernadette Kelly
I do not think we have yet determined exactly what the mechanism will be in terms of how the decision will be taken. We genuinely have not determined exactly how to do that. I think it likely that Ministers would want at least to consider their response to his review and have something to say about that before it is published. Genuinely, we have not yet determined how that process will run.
Chair
Of course, the National Audit Office is doing a review as well. Do you think they might coincide?
Bernadette Kelly
They are working to similar sorts of timeframes, but I know the NAO's work is ongoing, with an intention to publish later in November. They are certainly all in the same ballpark of timeframe. It is helpful if we can bring as much of this consideration to the decision that the Government will need to take. It is a very big and important decision and it is helpful for that to be informed by Doug Oakervee’s review but also by the NAO’s findings, which I am sure will carry some important lessons for how we decide whether and how to proceed.
Gareth Snell
Ms Kelly, your comment about the difference between phase 1 and phase 2b is quite clear. Stoke-on-Trent is hugely affected by 2b. Bridges are coming out already. Infrastructure road works are being developed by the local authority to work with potentially what phase 2b might deliver. What, if anything, is being done to put some of that work on hold in case 2b is scrapped, so that we do not spend the money unnecessarily preparing for something that does not happen? In terms of the local infrastructure projects in places around the 2b route, what conversations has the Department had about what preparatory works it should be doing or not doing? Obviously, the decision the Government make will have a huge impact not just on the Department’s transport policy but on the LEPs and the various other organisations working around it.
Bernadette Kelly
If you do not mind, I will answer the question at a slightly higher level of generality, rather than being able to give you a very specific response. In initiating the review, we have taken a conscious decision that the work will continue on phase 1a while the review is happening, in large part because the costs associated with stopping and starting projects, as I am sure the Committee understands, are enormous. That seemed, and indeed is, the sensible way to proceed. There are more questions to be asked about how work on 2b continues. I would expect judgments to be made on a case-by-case basis about where it was appropriate to pause work at this stage. One of the specific issues, as you know, that HS2 has been asked to look at is the question of ancient woodlands and whether we should continue with some plans that would have impacted on ancient woodlands while the future of the project is not secure. Where it makes sense to pause things without undermining the decisions that Ministers will eventually have to take, that is a sensible step to take.
Gareth Snell
Who is taking those decisions and when are they being taken?
Bernadette Kelly
I do not know the specifics of the Stoke works that you are referring to. We would expect in the first instance to be asking the company to look at where it was sensible to pause work, if that can be done in a way that does not risk then imposing very large costs and schedule delay if the decision the Government eventually take is to proceed with the project.
Gareth Snell
We have a couple of questions about Thomas Cook. In many ways, the Department has demonstrated quite quick resolve in dealing with some of the issues that arose from Thomas Cook. In particular, I wanted to ask about the application of the lessons learnt from the Monarch insolvency issue. I know the chair of the Airline Insolvency Review said that, even if they had been implemented very quickly after Monarch, they may not have been in place to deal with Thomas Cook now. Obviously, they have not been implemented and Thomas Cook has happened. Does the Department have a timetable for when it would like to see the recommendations from the insolvency issues around Monarch and now Thomas Cook implemented? Is there a piece of work ongoing?
Bernadette Kelly
There is. I may ask Gareth to say a little more about this. As you know, the Airline Insolvency Review reported in May this year. It is quite a complex piece of work. The Department has been considering how to respond and take its recommendations forward, but we have not yet had an opportunity to do so. Implementing the recommendations would require legislation in some cases. I think the Secretary of State has now indicated that he is very keen that we determine quickly how best to take forward that review and what steps should be taken to ensure we have a more robust framework for airline insolvency in the future. Gareth, I do not know if you can add to that.
Gareth Davies
Echoing the points on the complexity of this, two critical issues came out of the Bucks review. The first is the cost of any repatriation, particularly for those who are not covered by the ATOL guarantees. It is not just about money. It is also about the ability to have access to the assets of the company once it has fallen into either administration or insolvency, and the constraints you have particularly in accessing fleet capacity. Both of those issues are super complex, in terms of the potential implications for the cost of capital for airlines if you start to change the insolvency regime, but also the potential perverse incentives a levy regime might have on companies, essentially companies with a very strong credit position subsidising those that have a very weak balance sheet. We have had interesting representations, as you would expect, from the airlines, particularly Airlines UK. We need to do some very detailed work on that. That has been ongoing. Even if there was a clear route through, you need parliamentary time, which there obviously was not. Two things now need to happen. One is for Ministers to come to a decision on the actual recommendations they want to implement and the second is a parliamentary slot.
Gareth Snell
We are not exactly overwhelmed with work at the moment. We can put that down. In terms of the timetable the Department is working to, do you have an aspiration of when you would like to see some resolution and decisions being taken? Are you working internally to a particular timescale?
Gareth Davies
It is fair to say we have been working on this over the summer. The work on the actual operational side of Thomas Cook is resolved and we are moving our staff on to the operations role and the policy work. We are doing this in real time, but I want to emphasise the complexity. There is not a simple solution that would mean this problem will go away.
Chair
I know the Secretary of State has said there is an attempt to get money back from individual passengers’ and travellers’ own insurance policies. What is the real likelihood of that being successful and what is the risk exposure to the Department and the taxpayer?
Gareth Davies
Back to the lessons learnt from Monarch, the costs of Monarch were around—and I am just using rough figures—£50 million. This is about twice as large, so that gives you a sense of the net cost to the taxpayer of the total exercise. I do not have the figures for what we were able to claw back last time round. It was in the low millions, from memory, but I would like to confirm that.
Chair
That is partly why I am asking. I can imagine, once you have already got someone home, insurance companies may be a little reluctant to pay out.
Bernadette Kelly
So far, to be frank, the amount of money clawed back from insurance has been very modest.
Chair
Is there an element for a possible change in the law there? In this case, the taxpayer has stepped up and committed to, I think, £40 million.
Bernadette Kelly
Encouraging more passengers to take out insurance would seem to be a sensible thing to try to do.
Chair
Those figures suggest that the insurance companies are not actually then coughing up.
Gareth Davies
There are two things here. We had to come to an agreement with companies, including the credit card companies and merchant acquirers, about what the notional cost of the Government support has been. You are right: there is something about encouraging people up front to have private insurance and comprehensive travel insurance. As well, we are in active conversations with both the big insurance bodies, including the ABI, and UK Finance about what their members will do to help us claw back some of the costs.
Chair
You are hoping there will be some industry-wide guidance about what to pay back the taxpayer.
Gareth Davies
We are in conversations at the moment on this.
Chair
We will be pursuing that figure, because it is quite an interesting point that Monarch was, as you say, in the low millions. The taxpayer should not have had to bail this out. I echo Mr Snell’s point that the Department has done a good job in getting people back, but there is a lot more fallout from it that we will want to pursue in future.
Sir Geoffrey Clifton-Brown
Mr Davies, when will the last passenger who needs to be repatriated be repatriated?
Gareth Davies
We have announced that the repatriation exercise will be a two-week process, because the vast majority of Thomas Cook passengers were on one to two-week holidays, if you look at their portfolio of business. We have said it will run until this weekend; Sunday night will be the last night of flights. However, anyone who is on a package tour is supported by ATOL, and if it is three weeks, for example, they will then be flown back on other commercial flights, because there will be capacity in the market at that point.
Chair
We will move on to Sir Chris Wormald and the capital funding that has been announced for the 40 new hospitals. First, can you outline what in the announcement is new money and what is money the Department is allowing trusts to release from their own reserves?
Sir Chris Wormald
I will preface by saying I will have to write to you to confirm all this, because I did not bring everything with me. I think everything we have just announced is new money.
Chair
Okay, so the Treasury has handed it over, or is going to hand it over when the hospitals are ready to spend it.
Sir Chris Wormald
I will need to check the exact details of that for you, but these are new announcements that we have been making.
Chair
That is for all 40 between now and 2024.
Sir Chris Wormald
Yes. I will write to exactly confirm, because I know this is frequently a controversial issue.
Chair
It would be helpful if you could lay out the detail because we have been concerned, as you know, in this Committee about capital funding in the NHS, and then suddenly the magic money forest shakes down the money and the Treasury gives you the money.
Sir Chris Wormald
It is not quite like that. We have set out quite a lot of detail in our announcement on GOV.UK that backed the announcement. There is quite a lot there but I will write to you with the exact details of how this works.
Chair
It is definitely earmarked for the hospitals. How much local discretion will there be on how that is spent?
Sir Chris Wormald
The schemes themselves are schemes that were generated by the NHS previously. The way this works is that the NHS generates a set of schemes. That is then iterated between us and the NHS as to which ones would be funded. The things we have announced to be funded are things where there is already a set of plans.
Chair
You said all 40 are settled plans. We know the first five—
Sir Chris Wormald
For all the ones on which we have committed to building, so where the money is for the actual building, that will be for the existing plan, where there is a plan, to go ahead. Any reasonably designed hospital should already have had a lot of local consultation about the exact plan going forward. The second part of the announcement was on resources for people to work up plans. The working up of the plans ought to involve a lot of local consultation about exactly what type of buildings and services ought to be provided.
Chair
It might not necessarily be all acute services. It is a hospital but it could include community services.
Sir Chris Wormald
Yes. As you know, the whole system is blurring and positively seeking to blur the distinction between community and acute services, with more community services delivered in hospitals and more acute services delivered in the community.
Chair
There is no blueprint in the Department. You are saying it is very much grassroots up.
Sir Chris Wormald
Yes, exactly. These are all schemes that are generated by the NHS. That is how our new programme is meant to work in future. These are proposals from the NHS that we then choose to fund.
Chair
That brings me neatly to Mr Snell and Stoke.
Sir Chris Wormald
I have not brought any details of Stoke.
Chair
That was a big mistake, Sir Chris.
Sir Chris Wormald
There is no point in trying to have that level of detail.
Gareth Snell
There is always a Stoke question.
Sir Chris Wormald
I know there is.
Gareth Snell
The Prime Minister has previously announced about £20 million for the Royal Stoke Hospital. We are part of the PFI from the early days of the last Labour Government. I am conscious of how the two are going to interact between where you have rebuilds and new builds, and additions to existing hospitals that are under a PFI contract. What is the Department going to do with the PFI contracts?
Sir Chris Wormald
There is no one answer to that. The very first thing to say is that I am not going to comment on Stoke’s individual original contractual details, because I suspect you know them better than I, for a start.
Chair
You have admitted defeat, Sir Chris. That is very wise.
Sir Chris Wormald
Secondly, the issue is very high up our agenda. As you know, we are not doing any further PFI. We are aware that out in the system there are some quite successful PFI schemes and ones that are not. We have an advice centre within the Department that we established. Does it report to you, Steve?
Steve Oldfield
No.
Sir Chris Wormald
It is David, is it? It is an advice centre in the Department that is looking at existing PFI schemes and how we will work them in future.
Chair
That is a bit different to Mr Snell’s question.
Sir Chris Wormald
That includes the issues of how you then go on investing in the estate. Because all the PFIs are different, there is not a stock answer as to how you make that work, but it is very high up our agenda that we have to find ways to make it suit local circumstances.
Gareth Snell
This is not specifically Stoke-related, but has the Department, where there are existing PFIs, looked at simply buying out the PFI contract?
Sir Chris Wormald
We have done that on occasion. It depends on the value for money of the buyout versus the maintaining it. You are well aware from previous hearings of many of the issues around all that. You have to look at it on a case-by-case basis.
Gareth Snell
Finally, the other area this touches on that this Committee has looked at is the strategic suppliers that the Government use. With the collapse of Carillion, the collapse of Pochin and a number of other organisations having questionable balance sheets, is the Department satisfied that there exists capacity within the market to build these in a safe way that is not simply putting a lot of money into a handful of companies that may already be struggling to deliver on their existing contracts?
Sir Chris Wormald
I will check what our current market assessment is. It is much less of an issue doing a conventional build than a PFI, because your exposure to the company is much more limited. I am not aware that that has been raised as a concern. There are not any issues that have been escalated to me about that. I will go back and check what our current market assessment is.
Layla Moran
Mr Oldfield, referring to the story in The Times today about a possible export ban on medicines, why do we need this?
Steve Oldfield
We have not commented publicly on this because it is a leak. It is a hypothetical story. That said, I think it is fair to comment that this is something we have been looking at in detail with industry for quite some time now. We share industry’s view that, having already gone to these enormous efforts, as the NAO report outlines, to build stockpiles and put in place the rerouting plans, the last thing we would want in any circumstances, independently of the Brexit situation, is for product that is intended for UK patients to be needlessly shipped abroad in the name of arbitrage and profit making. For some time now, we have been working with industry on this as a business-as-usual measure to strengthen our hand in managing supply shortages. This is something we are imminently going to be announcing.
Sir Chris Wormald
It is not an export ban. We are talking about parallel exports. Where a British company is manufacturing stuff that it always intended to export, this has nothing to do with that. This is stuff that has been imported into the UK for the UK market where some movement in currencies might cause someone to want to then export it again.
Layla Moran
It is about wholesalers.
Steve Oldfield
This is an entirely legal activity under European law, whereby a product can be bought in one country at price X and sold in another country at price Y, where Y is greater than X, where, as Chris said, currency fluctuations play a very important part. It is not an illegal practice per se, but there are numerous examples now across Europe of countries taking the measure of putting in place temporary or indeed, in some cases, long-term restrictions on certain products that must not or should not be exported because they are experiencing a shortage for their national patients. That is the purpose of this particular piece of thinking. We feel it is very important. As I say, independent of Brexit we have been looking at this as a business-as-usual measure, as another tool in the basket, as it were, to manage shortages and shortage supply.
Layla Moran
I understand completely why you cannot say which the 30 critical medicines are. I completely understand that, but what kind of criteria are you using to decide what is critical and what is not?
Steve Oldfield
It is not about criticality. It is about availability and evidence of parallel exports. Where we have frank shortages or we know of significant risk of shortages and, in addition, we know there are actual exports taking place, or financially it looks like it is very viable for companies to do so, the combination of those two, on products we know to be needed for care in the UK, will mean they go on the list. The list will be updated as we get into announcing the programme. The idea is that the list would be updated on a weekly basis. To pick up on Chris’s point, to be clear, there is no suggestion here of banning legitimate export of products. The idea of parallel trade is entirely permissible under European law and no one wants to stop that. Where there is a shortage for UK patients, it is in our national interest to be able to control that.
Layla Moran
Zooming out to the reasons why this is happening, has a piece of work been done to assess what happens to the market in the worse-case scenario, the no-deal most likely scenario, in terms of pricing for generic medicines in particular? Has that work been done? Do you know what is going to happen to these prices.
Steve Oldfield
Is the scope of your question limited specifically to generic medicines?
Layla Moran
No, not necessarily. I am trying to get to how much more the NHS is going to need to pay to get the medicines it needs, given the volatility of the market after 31 October. That is the nub of what I want to know.
Steve Oldfield
I feared that was your broader question, because the answer is not, unfortunately, very brief or concise. The reason why it is not a concise answer is that different sectors of the market are governed by different types of pricing regime. I think we talked about this previously in a Public Accounts Committee. Let us take a picture of £17 billion, in round numbers, of medicines spend. Approximately £12.5 billion to £13 billion of that is governed by what we call the voluntary pricing and access scheme on branded medicines. That, in itself, has two parts to it: the voluntary scheme and the statutory scheme. Prices are controlled under those schemes. They are subject to a whole series of controls. Prices are set at the point of launch and then subsequently cannot be altered, because they are subject to pharmacoeconomic evaluation and can only be used routinely in the NHS if they have overcome a number of very rigid pharmacoeconomic hurdles, which is governed by a body called NICE. The £12 million or £13 million is protected for the NHS.
Layla Moran
Over what time period is that, roughly?
Steve Oldfield
The scheme runs for five years and it has just been renegotiated, starting at the beginning of this year.
Layla Moran
What about the rest?
Steve Oldfield
The rest are largely generically available drugs. The key factor here is that, in theory, the market has free pricing. That means that, depending on demand and supply, the prices can go up and come down. I should say that the UK fortunately, because of the system we have, has historically had by far the lowest generic prices certainly in Western Europe and often in the western world, on the basis that we have that freedom for prices to go up and down, so competition plays out as it should do. Where you have a particular molecule that is supplied by multiple suppliers, there is natural competition between the suppliers for volume. One of the key features of the generic drugs manufacturing industry is that volume is king. You can only accept the low prices you charge for those products on the basis that you can achieve the volumes. It is not just a UK question. These are largely multinational companies supplying to many markets across the world. In principle, we already have a very low-priced market. The competition is probably one of the major factors that play to our benefit in that sense. That said, we have monthly monitoring of the prices in the market, because the way that we pay for those generic drugs is through reimbursement to pharmacists, who dispense the drugs to the patients. The NHS does not ever hold a stock of drugs, at least not in primary care. It is a separate discussion in secondary care. The supply chain companies own the drugs, and buy and sell the drugs between themselves. Eventually pharmacists dispense to patients and the NHS reimburses pharmacists for both the cost of the drug and a small amount for the service of dispensing to patients. We have very good monthly information about the price of those drugs, so we will immediately start to see if there is any unusual change in the price of drugs.
Layla Moran
Have you done the scenario planning for, let us say, a 10% drop in the value of the pound for that kind of transaction?
Steve Oldfield
Yes, but the 10% drop in the value of the pound plays to your earlier question about parallel exports. The drop in the value of the pound is more likely to be a trigger for companies arbitraging across countries from a low-priced country to a high-priced country. Per se, the drop in the value of the pound is not a critical factor in the supply of medicines in the UK.
Layla Moran
They will not start selling to another country instead of us.
Chair
As much as Mr Oldfield is very interesting and it is a fascinating subject, we are in danger of talking more about drug pricing than the ones we are going to get across the channel.
Layla Moran
I just want to check we will not see any stopping of supply from across the channel.
Sir Chris Wormald
This is exactly my point. The generics market is a pretty pure market. It is determined by supply and demand. If we are successful at maintaining supply in the way we set out in this report, you will not see wild price fluctuations.
Layla Moran
Will they be tempted to raise their prices? Will the generic companies producing those medicines be tempted to raise their prices as a result of the turmoil after a no-deal Brexit?
Sir Chris Wormald
This plays to Steve’s point about a competitive market. Our defence in generics—and this is why it works in generics—is that you do have multiple manufacturers. If people are overpricing, other people come into the market. It is quite a flexible market. That is what has delivered us our low prices historically. As you will remember from previous hearings, we considerably enhanced our information powers in all this. Where we have seen spikes in prices for non-Brexit reasons, we have been reasonably successful at then intervening in the market.
Layla Moran
We are prepared for that volatility.
Steve Oldfield
We are and, importantly, we are prepared from an information point of view. The NHS is routinely collecting large amounts of information about how much it is spending on medicines and the Department is routinely collecting lots of information, because, ultimately, we reimburse the pharmacists.
Chair
The real time flow is coming with real-time information.
Steve Oldfield
Yes, but the final point that Chris made about the powers is not an insignificant one. You may remember that it is only since July last year that we now have powers to intervene in the market. Where we see what we might consider to be inappropriate increases in price, we now have new powers that allow us to intervene, investigate and hopefully resolve a situation where a company or the supply chain, any part of the supply chain, may be deemed to be profiteering, to use a common term.
Chair
We will leave that there for now. We now need to move on to the issue of freight. Ms Kelly, I am sure this is what you dream of doing.
Bernadette Kelly
Yes, of course, always.
Chair
We will remind you that you came in front of us on 5 June and gave us some assurances about when the contracts would be signed and so on. I am going to ask Mr Snell to pick up and ask you about ferries.
Gareth Snell
Ms Kelly, the total number of additional HGVs per week necessary is 2,546. How many of those do you expect to be active and available on 31 October in the event of a no-deal Brexit?
Bernadette Kelly
As the NAO’s report sets out, we currently have underway two call-off competitions. For one of them, we received bids yesterday. The bidding deadline closed. For the bids we received yesterday, we are looking to secure capacity for 31 October. I cannot give a precise estimate as to the exact amount of capacity that those contracts or that bidding process will result in, but we are confident on the basis of the market engagement we have had to date and the bids we have received that we should get a significant proportion, at least half of that capacity, in play by 31 October. I am reluctant to be drawn on very detailed numbers because we still need to go through a bid evaluation and contracting process.
Gareth Snell
We will not go for very detailed numbers, but perhaps we can go for a little detail. As I understand the split in the procurement process, the expectation was that the first tranche that ended yesterday would deliver 1,273 potential import and export spaces by 31 October. Without giving me a specific number, are you confident that, with the outcome of that bidding process yesterday, you will meet at least that target?
Bernadette Kelly
I absolutely recognise that number from the NAO report, which split the two competitions effectively in half, the first of which is looking at existing capacity. The second will look at new capacity.
Gareth Davies
You are exactly right: the two contracts are 50/50. The first one is existing capacity, which will be delivered for the 31st. The second contract is neutral. In other words, it could be either existing or additional capacity. That could still be delivered on 31 October, although the weightings are slightly different because we wanted to make sure we were able to access part of the market we were not necessarily able to mobilise by 31 October. It is at least half and we are confident that a portion of the second tranche will also be available on or near to 31 October.
Gareth Snell
The market testing suggested that it might not be possible to have all the freight by 31 October. Without asking you to give me specific numbers, and if we presume the end of November as the deadline discussed in the NAO report for the full array, are we looking at a date nearer 31 October or a date nearer the end of November for when you expect to have all that HGV capacity identified and in place?
Gareth Davies
I feel that is a somewhat invidious question, since we are still in the middle of the evaluation. It really depends on how the market has responded to it. I worry about giving you false assurance one way or the other on that. One the basis of the market engagement and the quality of the bids to the framework, we had a very good response to the framework call. If you look at the routes we are looking to procure, the volumes were in the order of 10 times what we need to have. We feel it is good. I just feel cautious about giving you false assurance. As I say, the bids only closed yesterday and we have only just started the evaluation process. It critically depends on what we have.
Gareth Snell
Given we are talking about no-deal Brexit preparations, whether it is false or not, any assurance would be welcome. Are you able to give an assurance that, at least by the end of November, you will have found capacity, whether new or existing, for 2,546 transits?
Gareth Davies
Based on what I have seen to date and recognising we are at the early state of the evaluation, I am confident of that.
Gareth Snell
The bulk of the additional capacity that is needed is coming from Sir Chris’s Department. We will get to that in a second. If you are unable to meet the full set of demands by 31 October, there will be certain expectations from Government Departments that cannot be met by the capacity that is available. What is the process the Department for Transport will apply to say, “Actually, yours is not a priority this week because we need to get this in”? How are you having that conversation across Government?
Gareth Davies
There are a couple of things to touch on. One is the overall governance process and then the criteria we will set. The governance process is a cross-Whitehall process for freight capacity, which includes demand Departments, like DHSC, Defra, BEIS and others, including the Cabinet Office and Treasury, and obviously us and the devolved Administrations. In terms of how category 1 goods are defined, it is a cross-Government process. We do not do prioritisation within category 1. The only way in which we then essentially ration capacity, should that be needed, is on what we call a first come, first served basis. Effectively, it will be the demands in from the relevant Departments because we do not prioritise between category 1 goods. There are then other options we can use. Colleagues will talk about the different lines of defence they have on medicines. Within the freight capacity we maintain a buffer stock, so we will be retaining 10% of the overall capacity to be allocated on a week-by-week basis, with the agreement across Whitehall.
Sir Chris Wormald
Most of these questions will come our way because 91% of the goods is ours, so we will come on to that.
Gareth Snell
Mr Davies, that is very helpful. This is what I was trying to understand: if you end up on 30 October and you have met the 50% capacity, and have demand that exceeds that, somebody is going to lose out. If you are not prioritising inside category 1, how do you determine who loses out? While you may be a category 1 good, I would presume—although I am happy to be told I am wrong—there is a hierarchy inside category 1 and this is more important than this, whether it is a Defra product or a health product.
Bernadette Kelly
I do not think there is, but there is a 91%, as Chris says. It is very much a challenge for DHSC.
Sir Chris Wormald
Yes, and we will do it not particularly on the basis of absolute priority, although there is an element of that, which I will come to. We will do it on the basis of what our alternative arrangements for those drugs are. I should have said at the beginning that we agreed the NAO report. We thought it was a seriously good piece of work and it was slightly unique, in that it was done in real time, so it was useful to our planning of these things, so I ought to give credit to my friends. As it sets out, we have a multi-layered approach to medicines. In the end, we go through, line by line, every single medicine and work out what the right solution for that one is. Where we have medicines that are stockpiled, which is the vast majority, we do not need flow day one, for example. We will not be ranking by need. We will be ranking by alternative arrangements for the drugs in question.
Gareth Snell
I am going to cut you off, because we are going to come to that particular aspect.
Sir Chris Wormald
Yes, but it is relevant to your question.
Gareth Snell
It is. Sir Chris has done his internal exercise that looks at what may or may not be. There may come forward something that he says is absolutely desperately in need to come as part of that additional freight capacity. You have a Defra official come and see you who has done the very same internal ranking exercise, albeit a tiny proportion. Who makes the decision about what gets on that lorry? Is it the product the Department of Health needs or the product Defra might need, because obviously you cannot take both?
Bernadette Kelly
That goes to the overseeing of the capacity allocation. As Gareth says, it is principally because, in truth, there will be limited capacity in real time to make very fine judgments of this sort. The principal mechanism will be first come, first served, on the basis that the vast majority of requests will be coming through from DHSC in any event. There is a small amount of buffer capacity. Ultimately, this is a cross-Government process. If there were very urgent requests, we would look to the cross-Government governance to determine where choices needed to be made. It is not a decision the DfT would feel it was capable of making, given that we do not understand the nature of these goods or the supply chains.
Sir Chris Wormald
I am sure we would use the Cabinet committee structure that is in place to manage a no-deal Brexit. Given the gearing of the numbers between me and everybody else, we would expect to be able to resolve that at official level, but if you actually had to take a strategic decision I think it would be the XO committee.
Gareth Snell
You are not going to be the referee in the middle. That is good.
Bernadette Kelly
No, I do not think we can take that on.
Gareth Snell
In the event of a no-deal Brexit, we actually do not know what the arrangements would be either at the island of Ireland border or potentially at the border between France and the UK. What is included in your contract for this additional capacity for freight? Is there any training or additional help and support that drivers might need so they know how to traverse those borders and deal with whatever the customs arrangements might be? We do not know what those are yet and this could be a contract coming online in, as the Chair pointed out, 29 days.
Bernadette Kelly
This goes principally to our work on haulier readiness. From the DfT’s perspective, one of the areas of no-deal preparation we have been particularly focused on is ensuring that as many road hauliers as possible understand the documentation that will be required if we leave on 31 October without a deal. We have underway an extensive communications campaign to ensure as many road hauliers as possible understand what will be needed. I can talk a little more, and I am sure Gareth can as well, about the nature of that. We have published a handbook in 11 or 12 languages because most hauliers working in the UK are not UK nationals; 85% of them are foreign nationals. We are currently setting up 100 pop-up sites around the UK, at truck stops, service stations and so forth, again with the intention of educating hauliers on what documentation may be required on 31 October if we leave without a deal. A lot of our work is very much focused on ensuring the road haulage industry is as prepared as it can be for the potential consequences of a no-deal Brexit on 31 October.
Sir Chris Wormald
I have one extra point as it is pertinent today. This is all about the UK-French border. This is all about bringing things through the short straits.
Bernadette Kelly
Yes, completely.
Sir Chris Wormald
It does not cover the Northern Irish land border. Very little medicine indeed goes across the Northern Irish land border, so that is not one of the things on our worry list.
Gareth Snell
No, but the UK is the provider of last resort for the Republic of Ireland for some of these things, so there would have to be some consideration.
Sir Chris Wormald
A percentage of the Republic of Ireland’s drugs come across the short straits, across the UK, but they then go direct from the UK to Dublin mainly. They do not go to Northern Ireland and down. Likewise, Northern Ireland’s drugs come direct from the UK. We do not have the Northern Irish land border question here. There are issues about how drugs get across the Irish Sea and all those things, but not across the border between the Republic and Northern Ireland. That is correct, is it not?
Steve Oldfield
That is correct. Northern Ireland officials estimate that only 2% of the drugs used in Northern Ireland come from the Republic.
Sir Geoffrey Clifton-Brown
I do not want to spread alarm, but it is well to ask the question, in the certainty that you have a good answer. If shortages occur, do you have a mechanism for how the medicine is going to be distributed around the country? What sort of notice do you think you could give to the GP or hospital, whatever it is, that they are going to face a shortage of X drug next week or whatever the case may be?
Sir Chris Wormald
Keith might like to explain this in more detail, but there is an existing system.
Sir Geoffrey Clifton-Brown
Yes, I guessed there would be.
Sir Chris Wormald
We use that when shortages occur for any reason, normally production reasons. There is a very tried and tested method of communicating with GPs and pharmacists. This would clearly have the potential to be bigger but, because of the multi-layered approach we have, we actually end up with quite a lot of warning. This is why we are taking action both to create a buffer stock and to fix the flow. The point of the buffer stock is to smooth any variabilities in flow that you get and ensure you have quite a lot of warning before you get to a shortage because you are running down your buffer stock at that time. I could not give you a number of weeks. The system holds a number of weeks’ supply in the supply chain in normal circumstances; I think you thought it was two to five.
Steve Oldfield
It is two to four weeks.
Chair
Then there is the six weeks.
Sir Chris Wormald
Then you have six weeks on top of that. We would be very closely monitoring the buffer stocks, so we ought to be able to see quite a long way in advance where we are running into problems. Then we ought to be able, therefore, to do something about it, including using our emergency channel, which I am sure we will come on to, for things that are not being supplied. Then we would have time to do what we normally do, in terms of activating protocols that we use with GPs and pharmacists when we are short of a particular drug. Do you want to describe what we do, Keith?
Professor Willett
When we are talking about shortages, the first thing is to recognise that the vast majority of shortages are managed upstream, in the Department. Of the, let us say, 100 medicines that might be short at any one time, literally less than a handful will reach the consciousness of either a GP or a patient. It may be worth it if Steve just explains what happens upstream, in terms of working with industry, and then I can pick up the number that filter down to require clinical input.
Steve Oldfield
The business-as-usual approach is that we become aware of a shortage or a risk of shortage from any of a number of sources. It might be a pharmacist. It might be a patient themselves who goes to collect their prescription, is told, “I do not have it” and contacts someone to make us aware of it. As soon as we are aware of the risk of a shortage, a whole series of investigations kicks off, usually starting with communication with the marketing authorisation holder to gather as much information as possible: how much is currently in the country, how much is available, if there are any underlying issues, the nature of the issues, the projected length of the potential disruption to supply, et cetera. Based on that, a group of pharmacists look at the particular medicine, armed with that information, and start to work on any of a number of potential mitigations. If it is a product where there are multiple suppliers of exactly the same product in the market, we look at the total amount of stock that is available from all the suppliers, not just the supplier that may have a problem. It may be—and this is a great example of what Keith just described—that a particular supplier that no stock whatsoever, but it only represents 10% of the total market for that product, in which case 90% of the market is still well. That supplier’s shortage will never reach patients. There is a series of escalating interventions that can then happen in order to avoid the situation where actual patients cannot get hold of their medicine. We call them the four tiers of escalation. By the end of tier 2, early tier 3, we are working very closely with the clinical response groups, the medicines clinical shortage groups, who are then evaluating whether further escalation may be necessary, involving at some point in the process even switching patients from one drug to another drug if there really is no supply available in the market. Maybe Keith can pick up that point.
Professor Willett
At that point, we put clinical advice into the system. The number that reach tier 3 is very small. The vast majority are met elsewhere. You made a comment about my title of strategic commander. That is because, for the purposes of dealing with a potential no-deal EU exit, we have enhanced the whole of that system and built it around the national incident response structure, which the NHS has used many times. It feeds into local authorities and, through local resilience fora, into the police and all the other emergency organisations. After 7/7, it was recognised that gold and silver were rather confusing terms. What was clearly needed was a strategic plan as well as a tactical delivery. I carry the strategic responsibility for doing that. We have built the whole of the architecture of response, which means that if we get to the point where we need to inform general practitioners, or indeed the public or anybody else, with the organisation we have in emergency preparedness and national incident response, I am able to pull levers nationally that guarantee that information will go right down to doctors, hospital pharmacists, community pharmacists, wherever it needs to go. We have that system. As of this month, all GP practices are required to register with what we call the CAS alert system, which informs them if there are any medicine shortages. We did not want to do anything different. This applies not just to the shortage of medicines. This applies to the whole of the NHS, whether we are talking about vaccines, workforce or anything in the NHS that may relate to EU exit. We have taken our normal architecture that deals with incidents and enhanced it alongside that process so we can respond to whatever we may have to.
Layla Moran
This is raising something that has come into my constituency surgery. Some patients contact me saying they cannot get hold of medicines now and they were told by their pharmacist, they say, that this was because certain suppliers are holding some stock back to meet the six-week demand. Have you heard of this?
Steve Oldfield
No. I have absolutely no evidence of any cases where a supplier is holding stock back in the context of the buffer stock build for Brexit, none whatsoever.
Layla Moran
If it is happening it is not reaching you.
Chair
The buffer stock is completely separate in your mind and in experience.
Steve Oldfield
Physically, it will not be held separately.
Chair
I mean the buffer stock is there regardless and the supply issue is a separate issue.
Steve Oldfield
I think Ms Moran is suggesting that some companies are meeting their buffer stock requirements by not selling their ordinary stock. I have not heard of any cases of that.
Professor Willett
I was just going to explain that shortages occur and occur regularly, and have done for many years. That is something we manage, but there are many reasons for shortages. At the moment, we do not recognise EU exit as a cause for any of the medicines that we are concerned about. It is much more likely to be raw materials, production line failures, quality batch issues or packaging failures.
Chair
We have looked at those in detail in this Committee before.
Layla Moran
To quickly follow up on that point, there is no evidence at all that shortages in general are increasing as a potential side effect of these preparations.
Chair
I think we have heard that loud and clear now.
Gareth Snell
Can I go back to you, Ms Kelly, on freight for a couple more moments? To pick up on your point about readiness of the road haulage industry and the work the Department has done there, can I draw your attention to paragraph 2.26 in the NAO’s report at page 28? It says that the estimate in June was that between 50% and 85% of HGVs using the short channel crossing may not be ready for the new French customs procedures. That is quite a wide range. Are you able to give a narrowing of that range, or even a single figure?
Bernadette Kelly
Our range is actually still quite similar to that. We estimate readiness to be at 15% to 50%, which is another way of looking at that number. I am afraid I cannot give you a validated updated number for that.
Gareth Snell
Does it worry the Department that as many as 85% of the people going over that particular border may not be aware of the new customs arrangements?
Bernadette Kelly
Absolutely, it clearly does. It is why we are putting enormous focus into communication with the road haulage industry, both through trade associations and at an individual level, to give it every possible opportunity to understand what it needs to do to prepare. That activity has stepped up enormously in recent weeks. I have talked about the pop-ups. I think we now have more than 80 of those set up, as of this week, to provide advice and guidance to hauliers. I think we will we stepping those communications up further still in the weeks ahead if there is still a possibility of exit on 31 October.
Gareth Davies
In terms of the estimates, it is a large range. As you know, by the nature of the haulage industry, there are 40,000 hauliers, which are often one-man bands. Most of the effort in the Department now, where I am focusing my time, is on getting as many people ready, rather than trying to increase the accuracy of potential estimates. The effort is really focused on reaching out to the haulage industry, working with people like the haulage associations and trade associations. We have events this week, for example, at the RHA conference in Birmingham. We have the pop-up locations, as the Permanent Secretary set out. I think they are live now in over 40 locations, 80 by the end of this week, in places like Cobham. We have the hauliers’ guidebook, which is in 11 languages.
Chair
On the pop-up support, you talked about truck stops. If you are driving down the M1 or the A1 and there is a truck stop, there might be one of your civil servants in a tent.
Bernadette Kelly
It might well be. This is a contracted service.
Chair
There might well be a pop-up site. Is it a little tent in a layby?
Bernadette Kelly
They are two-person pop-up sites, where advice and guidance is provided in a range of languages.
Sir Chris Wormald
That number is across the economy, so not necessarily people who would be using this service. We do a lot of bespoke stuff with the pharmaceutical industry, which Steve does, where we generally have much higher levels of awareness, as you would expect.
Gareth Snell
You have pre-empted my next question, which is on the hauliers you intend to engage for the purpose of this contract, and the suppliers of the freight capacity on the short straits, whether that be through the ferries or the tunnel. Are you working with them, so they can also work with the hauliers to help reduce any confusion at the ports and at the terminals with the customs arrangements?
Steve Oldfield
As you can imagine, this is a big task. We have little concern about the very large hauliers that represent the largest of firms, because we have engaged with them. We know they have invested a lot of time and effort in ensuring they know what it is going to take to get across the border. Our concern is that we reach the very, very smallest of hauliers representing the very smallest of companies. If I can share a few figures from our ongoing survey—and I keep insisting that this is a live process; we gather information all the time—at the moment, about a fifth of companies we have engaged with are saying they do not yet have all the information they need in order to get themselves ready. About another 15% have all the information but they have not finalised their plans. Then the rest all have the information, and have either got themselves ready or have evidence that the third-party logistics company they are relying on has got itself ready. It is an emerging picture, but as you can see those numbers are rather higher than the broader picture that is being presented.
Gareth Snell
No, actually, they are not, Mr Oldfield. You are saying that 75% would not be relevant.
Steve Oldfield
I am saying about 35% will be at a lower level of preparedness. About 20%, a fifth, do not yet have all the information to feel confident that they can be ready, and 13%, to be precise, are suggesting they have all the information but their plans are still emerging.
Gareth Snell
I am not going to argue figures with you, but the global figure is that between 15% and 50% may be ready. You say that you have 35%. Last time I checked, 35% is somewhere between 15% and 50%.
Sir Chris Wormald
No, it is the other way round: 67% will be ready.
Steve Oldfield
That is probably understandable, given the huge amount of time and effort that, as a sector, we have invested in engaging with both suppliers and their representatives, involving them, frankly since last year, in workshops to figure out what it is going to take to be ready. We have run webinars. We ran a webinar recently and had in excess of 600 companies join a single webinar, on which we brought in experts from the Department for Transport and HMRC to provide advice. As we speak, at the moment we are in the process of standing up a dedicated trader readiness unit, a small unit within the Department that is going to be able to signpost companies to the parts of Government that they need to interact with in order to get the information they need.
Gareth Snell
The 35% that are not going to be ready—
Steve Oldfield
Sorry, I really must correct you. I am not suggesting they are not going to be ready.
Gareth Snell
They are not ready now.
Steve Oldfield
On the basis of the information we have at the moment, they are at a lower level of readiness.
Gareth Snell
Let me finish my question. With the 35% that are not ready, what are you doing to make sure they will be ready by 30 October?
Steve Oldfield
It is all the things I have just mentioned, in particular the most recent efforts to establish a small group of people who can interact with companies on a bespoke basis.
Gareth Snell
Okay, but we are talking about having something that is ready in 29 days. What are you doing to monitor the progress of that on a daily, live basis? What progress are you seeing, within that subset that either do not have enough information and therefore are not ready, or do have the information but are not ready, to make sure that by 31 October you have as many people ready as possible to deal with the new customs arrangements at the port?
Steve Oldfield
That will be one of the great benefits of having a small group of people dedicated to doing this work. I must just say that the broader Government efforts on this have been radically stepped up over the last few weeks, as you will have seen on TV, in newspapers and so on. This information is being provided at a time when even the companies that previously had not really understood the scale of the task, or whatever, are now finding it more and more difficult to avoid being aware of the fact that they need to do something. We want to not just rely on the broader Government efforts, which are already quite substantial, as you have seen reported in the press, but create our own sell for our own sector. We feel that all sectors should be taking these kinds of steps, to ensure they are ready.
Gareth Snell
Ms Kelly, why is the Department for Transport not doing everything that Mr Oldfield is doing in the Department of Health?
Bernadette Kelly
We are doing very much the same activities.
Gareth Snell
Is there duplication?
Bernadette Kelly
No. There is a lot of communication going on. It is all complementary. It is important that we use all our communication channels at this point in time, when we are trying to ensure that preparedness is as good as it can be. We are working very closely, as Steve has indicated, in terms of his efforts to reach out to his sector. We, in DfT, are focusing on road hauliers in general, and ensuring that we are getting messages across to road hauliers economy‑wide about what they need to do to prepare. All the communication and all the work is entirely complementary, and duplication is not the issue here.
Steve Oldfield
As I have indicated, for the webinar that we ran, we were the facilitators of the webinar. We have the contacts with the companies in our sector, but the providers of all the expertise and information were other Government Departments that hold that information.
Gareth Snell
I want to move on slightly. As has been established, every day is important in this process. Every day is a day closer to potentially leaving with no deal on 31 October. Could I ask you, Ms Kelly, why it was that the procurement process started 19 days later than was estimated? Was there something internally that prevented this going as quickly as possible?
Bernadette Kelly
The work on this procurement probably started back in June, in fact, about the same time as I appeared before this Committee to talk about what would happen in relation to potential procurement for freight capacity for 31 October. Around the end of June, the Government set out in a written ministerial statement the procurement process that they intended to adopt. This is the framework process that we have now been operating, followed by call-off competitions to contract for capacity. As for the 19-day delay, it is probably fair to say that, through June and July, which was the time of the Conservative leadership election, there was rather more reluctance than might otherwise have been the case for Ministers to take firm decisions about no-deal planning when they were anticipating a new Government being appointed very soon. The consideration was that some decisions were more appropriately taken by new Ministers.
Chair
Was this a decision by Ministers or by civil servants?
Bernadette Kelly
This was a decision by Ministers.
Chair
They were not confident that they would be in position, for example, so they wanted to leave it.
Bernadette Kelly
As we got closer to the point of being in a new administration, understandably, the reluctance to commit to very firm decisions grew. I should say, from an official’s perspective, we were always very conscious of the need to ensure that the procurement was proceeding at pace. That is why the very first piece of advice the new Secretary of State received in the Department for Transport was advice that we should proceed immediately to publish an invitation to tender, and he took that decision. It appeared on the OJEU immediately afterwards.
Chair
Did you at any point consider pushing through the decision before the new Secretary of State was appointed? Were you getting worried?
Bernadette Kelly
We are all conscious of the compression to the timeframe, and our recent experience would lead me to worry about compression to timeframes. Equally, we can advise Ministers, and Ministers take decisions about what they consider appropriate. We feel we have been able to reset this, through the two mini-competitions that we are now holding, and by putting some pressure on the mobilisation timeframe. We think we now have a process that will, as we discussed earlier, secure significant capacity by 31 October.
Gareth Snell
The mobilisation timeframe has been cut by two weeks, has it not? Is that correct?
Bernadette Kelly
In a sense, that is where we have sought to make the time up. We are allowing less mobilisation time, and that is why the first competition is very much focused on existing capacity, where we would expect bidders to be able to mobilise quickly.
Gareth Snell
You are going to be announcing the results of that competition on 12 October.
Bernadette Kelly
As the NAO report indicates, the current plan is that we expect to contract on 12 October.
Gareth Snell
You are not expecting any delays to that date.
Bernadette Kelly
We are working towards that date at the moment, and nothing we have seen thus far leads us to think it should not be achievable.
Gareth Snell
That would give less than three weeks for successful bidders to properly be up and running on 31 October. I appreciate there is a reliance on existing capacity. Is the Department confident, without going into the details of the bids you have received, that three weeks is enough time, even if they are using existing capacity, to have all the ducks lined up facing the right way?
Bernadette Kelly
It is unquestionably tight; that is true. Equally, what we have had the benefit of in this procurement, and the way we have carried the procurement out, means that there has been very extensive market engagement throughout the process, and that gives us more confidence that bidders now, for this first competition, will be bidding on the expectation that they can meet the 31 October date.
Gareth Davies
I would make two points. First, the extent of market engagement and the feedback we got from that market engagement process give us confidence in the mobilisation window around existing capacity. Secondly, this is obviously the second time round. The market was aware of the type of capacity we were looking for. Even if they did not have the details of the particular contracts, they knew the sort of structures, processes and timelines we would be looking for, so the feedback we have had from that gives us confidence in terms of mobilisation.
Gareth Snell
Could I ask you both when you expect to be able to hand over to Sir Chris a list of new priority freight routes, new sailing timetables, the whole shebang that allows him to go and talk to the suppliers so that they can reorganise themselves?
Bernadette Kelly
The expectation is that, if we meet the 12 October deadline for contracting, which we would hope to, DHSC will be able to move very quickly into ticketing and making that capacity available to its supply chain. It is not quite handing over. The way this operation works in practice is that we will be running a prioritisation operation centre to ensure and oversee the overall contracts, and DHSC will be working with its supply chain to ensure its category 1 goods have access to capacity.
Gareth Snell
Sir Chris, the 12 October comes around and the DfT signs a series of contracts with a number of suppliers for new routes. How quickly can you get that information out to your suppliers to tell them the new sailing timetables and new freight routes, and how much time have they told you they need to reorganise their own internal supply mechanisms to be able to match up with the timetables?
Steve Oldfield
The answer to your first question is that it would go out instantly. We have well-documented contacts in all the suppliers, whether they be medical devices or medicines, so as soon as the information is available it will go instantly. As you can imagine, a lot of preparatory work is being done in parallel. We are working hand in hand with the Department for Transport on the setup of the operations centre, on the information that we believe suppliers are going to need in order to then act upon the route information. We believe that the combination of preparing the ground in parallel and instant information transfer, once we have that information about the routes, capacities and so on, will allow suppliers a good opportunity to get themselves ready.
Gareth Snell
A good opportunity—
Steve Oldfield
Everybody will be doing everything they need to do to be able to access the routes and take advantage of the routes.
Gareth Snell
Has the Department factored in any suppliers coming back and saying, “We can still supply you, but if you want a middle of the night pickup rather than the normal time of day there will be an additional cost for that”. Have you factored in contingencies for suppliers wanting compensation for reorganising their normal supply arrangements in order to meet the sailing timetables, freight routes and various other things that are being asked of them?
Steve Oldfield
To be clear, the middle of the night pickups would be from where?
Gareth Snell
If suppliers are having to reorganise their supply arrangements in order to meet the sailing timetables, and if we are talking about using existing capacity on ships that are maybe sailing later into the evening or earlier in the morning than the normal time, there is potentially an impact on when the HGV will pick up that series of goods. If your supplier has to change the way it is operating to better match up with the availability of HGVs and sailing times, it might come back to you and say, “We can still do this, but there is an additional cost burden on us, which we wish to pass on”.
Steve Oldfield
I refer back to the previous answer I gave to Ms Moran about the way that pricing and cost in the market functions. In the short term, the vast majority of the market is covered by either regulatory mechanisms on pricing or competition-based controls on pricing.
Chair
Are you saying the companies will have to absorb these extra costs?
Steve Oldfield
In the short term, yes, the companies would have to absorb all that. I should also say that the vast majority of these companies are using large, well-recognised and very experienced third‑party logistics and haulage companies, which are very, very used to moving things around from place to place at short notice and changing some of their plans.
Gareth Snell
Could I talk about the ports very briefly, Ms Kelly? On the infrastructure around the ports, I know some of my colleagues who represent seats with ports in them are very grateful for this extra investment and looking forward to seeing it come online. Given that the 31 October date for leaving the European Union was known very early on after the initial extension in March, why was it not until the end of August that the Department started releasing money for some of the port infrastructure improvements?
Bernadette Kelly
It was a decision of the new Administration that they wanted to offer further ports resilience funding as part of the overall package of measures being taken to support no-deal preparations. We were able to act quickly on the back of that to announce a £30 million fund, and now £10 million of that has been allocated to some of the key ports, as well as £5 million to some of the key local resilience fora. This was simply a judgment taken by the new Government, something that they wanted to do, funding that they wanted to make available, and we have moved as quickly as possible to ensure that money is being channelled to ports and resilience fora.
Gareth Snell
In terms of the difference between readiness for potentially leaving the EU back on 29 March, which feels like a lifetime ago now, and on 31 October, is it the case that those ports simply would not have been able to cope back in March; is this additional investment in October because new information has come to light about being properly prepared for no deal; or is this an opportunity to invest in some port areas under the guise of Brexit, regardless?
Bernadette Kelly
It is additional resilience funding. It does not follow that none of these ports would have been able to manage on 31 March, but the Government have decided to provide some additional funding to assist them and ensure they are doing everything they can to prepare their own capacity and resilience to deal with this. I do not know if there is more to say than that.
Chair
Can I ask whether that £30 million came directly from the Treasury, not from your reserves?
Bernadette Kelly
The £30 million has been part of Treasury funding. It is new money.
Chair
It is direct new money.
Bernadette Kelly
Yes. I should say we see value in this funding regardless of what happens on 31 October. One of the interesting side effects of Brexit is that it has shone a light on ports resilience more generally, and whether there is an argument for doing more to support the industry in ensuring that our ports are as well prepared for any eventuality as possible. From a Department for Transport perspective, we see some wider benefits from these investments.
Chair
It was very short-notice money arriving to be spent very quickly. Perhaps you can point us to where we can see the criteria, because I did not look it up before this hearing, for those ports to bid. Did you decide, or did they bid for it?
Gareth Davies
To confirm, this was new money. This was part of the £2.1 billion that was announced by the Treasury in July, so this is additional funding to the Department. In terms of the criteria, I do not have the full list in front of me, but some of the criteria included the readiness of the projects, in other words whether these projects could credibly be implemented in time for 31 October, including the impact that would have on flow rates and resilience. The individual ports would bid in, and then there was a normal procurement process with a criteria-based assessment. We can set out the full set of criteria in writing if that would be helpful.
Chair
So some ports failed in that.
Gareth Davies
Yes, exactly. To come back, Mr Snell, to your question about the ports being ready or not, the way we are looking at it in the Department is less about being ready or not, and more about how we can improve their flow rates. If you look at somewhere like Dover, the critical question is less whether they are ready; it is how we can maximise their flow rates. We look at it as a percentage of the flow rates you would have expected to have in November last year.
Gareth Snell
Given that the August to October window was quite small, and therefore you had to go for shovel-ready projects, was there any concern in the Department that you would be funding projects that, although they are shovel ready, are not necessarily best value for money in terms of meeting the flow improvements for HGVs in the event of a no‑deal Brexit?
Bernadette Kelly
That is the purpose of the evaluation procedure. We would want to ensure that any money being invested was a good use of taxpayer’s money, and we would set up the competition and the evaluation criteria to enable us to make a sensible set of judgments about whether the projects met those criteria. I should say that half of the £30 million ports resilience funding is being used to support longer‑term projects. We are trying to strike a balance between the things that can be done immediately to support flow and the sorts of investments that might make more sense over a slightly longer timeframe.
Gareth Snell
Do you happen to know the total value of all the bids received from the ports?
Bernadette Kelly
I do not.
Gareth Snell
Are we talking around £15 million or considerably larger multiples of that?
Bernadette Kelly
I do not think I have that number.
Gareth Davies
I do not have it to hand, but I do not think it was orders of magnitude different from what we were able to award. Because of the way in which we structured the criteria, there had to be the shovel-ready test.
Gareth Snell
If I were Dover Council and suddenly there was local resilience forum money, I would want every bit of road that I could possibly squeeze in, to get some money out of it, and I am sure that some clever councils were able to get some other projects done. Can I turn to you, Sir Chris, and talk about your Department’s process for the contingency arrangements for where individual suppliers’ own arrangements fail? I understand that you have a separate piece of work that should come on-stream ready for 1 November that will allow suppliers whose own arrangements do not meet the requirement to tap into your system?
Sir Chris Wormald
That is one of the purposes. As set out in the National Audit Office report—and I will ask Steve to add some more detail—we basically have an emergency channel for goods that you need at very short notice anyway, or where we have an urgent operational need for something and the rest that our system has not delivered it. That is being contracted for separately, and that is a specific health system. It is basically a courier service.
Gareth Snell
You are going to have the contract signed on 8 October.
Sir Chris Wormald
They are on track for that.
Steve Oldfield
Yes, they are on track. We should be in a position to award the contract later this week or at the beginning of next week.
Gareth Snell
Paragraph 2.24 in the NAO report, on page 28, says that you ended the bid process for that on 21 August, and you were looking to sign the contract from 8 October. That is quite a long period of time for a courier service, when Ms Kelly’s Department has been able to potentially find thousands of HGV slots from a bidding process that ended yesterday and will be signed off next week. What was the delay in signing off those contracts? Why was there such a long window?
Steve Oldfield
There was not a fixed window. The difference is to some extent the complexity rather than the size of the contracts. The type of service that was being contracted had very specific conditions around it. The procurement has been run under three separate lots, one for a cubic meterage of small parcels, one for a number of pallets that would take two to four days, and one for a broader catch-all called “specials”, which could be anything from special conditions of carriage through to special handling, temperature control, et cetera. The complexity of the ability of the people bidding for those contacts to deliver each of those services was quite extensive, so it has taken some time to clarify the bids, confirm the bids and get to the point where we have almost been able to award them.
Gareth Snell
You are going to award those on 8 October. Paragraph 2.24 says the services are to be in place for testing by 24 October.
Steve Oldfield
Yes, the language is not quite right there. The intention is that they are ready to go live on 24 October, so the testing will happen between the award of the contracts and 24 October. Apologies, we did not pick up on that.
Gareth Snell
You have a few more extra days now, but presuming one of your tests comes back, and there is a problem or an issue, what resource is available in the Department to remedy that? You are talking about potentially quite complex logistical arrangements for which there presumably is not necessarily a quick fix available. If a test flags a problem, what is available in the Department to try to remedy that before 1 November?
Steve Oldfield
By their very nature, the channels that we are trying to put in place are infinitely flexible, especially lot 3, which we have termed the “specials” lot. It foresees a whole range of situations. The idea is that that lot in particular has the ability to pick something up at a point of departure and deliver it at a point of need, for example picking a parcel up in Gdansk and delivering it to a hospital in Bedford. By their nature, they are very flexible resources that we are procuring.
Sir Chris Wormald
We have tried to build the contingency into the whole contract, so you try to deliver things through lots 1 and 2, and then you effectively have a backstop.
Gareth Snell
Do you have an alternative arrangement to the backstop, just in case?
Sir Chris Wormald
You get half way through a word. You know what I mean. This is the approach we tried to take throughout what we have been doing. We built contingency into the individual elements of the plan, and then each element of the plan acts as a contingency to the other element of the plan. We have tended to put contingencies like that into the contract structure.
Gareth Snell
I suppose more for my own curiosity, a huge piece of work has been done by the DHSC for very specific arrangements, and a huge piece of work by the Department for Transport. Was there a reason why these two things were separated and there was not a particular transport and logistical element for all Departments done by the Department for Transport, as opposed to allowing individual Departments to look at their own internal arrangements?
Bernadette Kelly
Coming back to complementary activities, we determined back in June that, as for the previous procurement, the DfT would take on responsibility, for the whole of Government, for the procurement of freight capacity for category 1 goods across Government. That is obviously the particular piece of activity that has been led by my Department, but on behalf of the whole of Government. It just happens that DHSC is by far the biggest customer for that capacity.
Sir Chris Wormald
We also have the most specialised needs, for the reasons Steve gave: temperature controls and security. Entirely practically, because we are dealing with some of the most regulated things in any market, we know where they are made, who made them, how they get to their end user and who the end user is. Across most sectors of the economy, while you could at individual company level, at Government level you could not do the kind of analysis we can do on the drugs market, because all the data we use comes out of our regulatory system. There are some things you have to do for the whole of Government, and some things we can do for our very specialist requirements, because of the nature of the information we either hold or can reasonable easily acquire, particularly about the drugs and medicines element.
Gareth Snell
The last question from me relates to paragraph 2.19 of the report, on page 27, in particular where the Ministry of Defence may fit in. I appreciate there always has to be a contingency to the contingency, and in this case it is the MoD. I was wondering, realistically, how likely it is that the MoD may be needed. If it is needed, all I want to be clear about is the chain of command, almost, so you are not going to suddenly deploy military equipment through the Department for Transport. What are the triggers that allow you to activate it?
Chair
You are Rear Admiral Kelly from now.
Bernadette Kelly
You never know. It could be quite an attractive proposition.
Gareth Snell
We have a commander.
Bernadette Kelly
We are working closely with the MoD at the moment to see if one of its vessels can be secured as a further contingency to the contingency. That work is ongoing at the moment. We expect XO to take some decisions about how we progress with that, I believe, tomorrow. There is a realistic prospect that a vessel could be available from 31 October. There are some modifications needed, but not ones that would be impossible to do for that timeframe. I suspect the commercial arrangements we are making will be the more plausible route for securing the capacity we need, but we are continuing to take forward that MoD option as a further backup to our plans.
Gareth Snell
This is genuinely the last question. When the MoD was drafted in to help the Home Office do border patrol, there was a very public disagreement between the then-Defence Secretary and the then‑Home Secretary about who was going to pay for that. If you get to a point where you are drafting in an MoD vessel, presumably with service personnel crewing that vessel, has there been any discussion about who bears the liability for that cost or even just the holding costs?
Bernadette Kelly
The plan includes consideration of what the costs are. There would be costs associated with modifying the vessel. There would be backfilling type costs for the MoD, and then there would be a cost for actually operating it. We are working through all that at the moment. I would hope a sensible cross-Government agreement would be reached about how those costs were to be met, without the need for any public disagreement.
Gareth Snell
So would we, but you know.
Chair
So the roads programme will not be slashed to pay for the MoD vessel.
Bernadette Kelly
I would hope that the roads programme will not be the source of funding for a MoD vessel.
Chair
I think you are tempted by the rear admiral position. In this current climate, who can tell? A lot of money is going into all this, particularly the specialist courier freight for the NHS, some of which may not happen. We do not know what will happen between now and 31 October. We understand the Prime Minister has just announced new plans for a deal. We will see what that means when we leave this room. What if we do not leave with no deal on 31 October? Will any of the money that has been spent on this actually be useful for day-to-day business, particularly in the Department of Health and Social Care?
Steve Oldfield
I can talk to the dedicated health channel. For example, the way we have structured the bids and contracts this time around, as far as is possible within a commercial bidding environment, builds in some degree of protections for early termination, non-utilisation, et cetera. I suspect that the Department for Transport is very familiar with this kind of bidding process.
Chair
Bernadette Kelly, we had this last time. It will be Groundhog Day in the Department. If that is not used after 31 October, will you have to pay off the contracts again?
Bernadette Kelly
Again, we will be doing exactly the same as Steve, in that we will be looking at the bids and awarding contracts with a view to setting termination cost arrangements in place.
Chair
There will be a cost, but you are trying to cap it.
Bernadette Kelly
We are, absolutely. Much depends, as ever in these circumstances, on when decisions are then taken about whether that capacity is needed, but from a taxpayer’s point of view we will try to get the best possible arrangements that ensure we can claw back money if contracts are terminated early.
Chair
We questioned you a lot on the legal risks last time. It cost a lot of money with Eurotunnel; another court action is still underway. Clearly there were lots of lessons learnt there, and I know it was at great pace last time, but it has been quite rapid this time. Are you confident that there will be no legal challenge to the decision-making process in the letting of contracts?
Bernadette Kelly
We have constructed a very different framework process. We are not relying on the procurement exceptional circumstances that we did last time. We are therefore much more confident that our process is legally robust, and clearly we have designed it and run it to ensure that it is as robust as possible. All procurements are legally sensitive, so I cannot tell you that no challenge will happen. That is always a risk with any commercial procurement but, as I say, we have learned lessons very thoroughly from last time and done everything we can to ensure our legal exposure is minimised.
Chair
You have the framework contract. Were there many more suppliers that bid to go on the framework contract for the ferries that did not get on to the framework?
Bernadette Kelly
We had eight on the framework. We had a significantly larger number that were initially interested in being part of the framework, so that was quite a substantially smaller number.
Chair
Of the eight companies, how many actually own ferries?
Bernadette Kelly
We have one that is an air charter services company, so I am guessing it does not. The others are established operators: Brittany Ferries, DFDS, Irish Ferries, P&O, Seatruck, Stena Line, and we have Channel Tunnel Group in there as well. These are established operators.
Chair
We noticed that Channel Tunnel Group was in the list. Given the whole point of this is to avoid the short straits, what does the Channel Tunnel Group offer in addition to what it already does?
Bernadette Kelly
The framework is a four-year framework contract, and the idea is that we could draw off capacity at any time in that timeframe to deal with a wide range of disruption. Remember, we have seen disruption across the short straits before, for reasons wholly unconnected with Brexit. This is a broader framework agreement on which we can draw down.
Chair
In a way, it is a hedging, an insurance, against a ferry problem.
Bernadette Kelly
Yes, indeed. It is a broader framework to deal with a broader range of resilience issues.
Chair
It is possible that that might not be drawn down.
Bernadette Kelly
In the course, we would exclude the ports that we think to be at the highest risk of disruption, because clearly there is not much point in procuring capacity in the areas where we think there is most likely to be disruption.
Chair
I want to move on to the social care sector, Sir Chris, because we are quite concerned about this. You have your own NHS supply chain, and Mr Oldfield has described that, around medicines in particular. You have your own NHS supply chain for clinical consumables, but the social care sector does not have that same supply chain. You have stockpiles in the NHS. There is not a similar approach to social care. Quite simply, why?
Sir Chris Wormald
That is not quite right. We have applied exactly the same principles to both health and care, and indeed they draw on a number of the same arrangements. Our medicine stockpiles and arrangements, as you would expect, apply regardless of sector, and ditto medical consumables. We also deal with big suppliers across the health and care sector. We have 189 big strategic suppliers on our list.
Chair
What percentage do the 189 suppliers provide?
Steve Oldfield
The 189 key suppliers provide 80% of the total medical devices.
Chair
Yes, it is the report. Forgive me.
Sir Chris Wormald
Of those suppliers, 31% were suppliers suggested by the care sector. The issue is exactly as set out in the NAO report. We do not cover, for either health or care, locally supplied consumables of any type. The difference is that the care sector, because of the way it is structured, as set out in the report, has a lot more on the local supply side than the health service does, but if a hospital is sourcing something locally, or something outside our supply chain, we have said—Keith in particular—to hospitals, “That is your job to sort out, looking at your contract”. There is not a difference in principle about what we have done. What is different is how it plays out in the sector. As you know, our links into the care sector are of a completely different type to health, and therefore we work much more through intermediary bodies, particularly local government and the CPA, the Care Provider Alliance. We work mainly through those groups, although we have given advice to everyone in the care sector on the steps they should take. Our way of monitoring and dealing with them is much more through our local government networks.
Chair
Yes, because it is quite a diffuse sector.
Sir Chris Wormald
It is very diffuse.
Chair
There are lots single operators.
Sir Chris Wormald
Yes, lots of single operators, lots of SMEs and lots more people whose supply chain is much more local, where, with the best will in the world, we cannot track it. We do not have the information.
Chair
Practically, if you have a small care home run by one person, how can you persuade us that you understand its level of readiness? I suppose local government has a better chance of knowing its own area.
Sir Chris Wormald
I am not going to claim that the Department understands those things. As you say, local government has a much better chance, and is the contracting agent for the publicly funded element of this. We have regular contact with and surveys of Adass, the social care leadership, about its levels of confidence, which are quite high. That said, and this is key, across both the NHS and the care sector, contingency arrangements involve a chunk of “prevent”, which is largely what we have discussed so far, and a chunk of “respond”, which we might come on to, particularly some of the things that Keith and Steve do. Undoubtedly, dealing with the care sector, the balance will be a lot more on the “respond” part.